Thanh NGUYEN, Phong and Le Hoang Thuy To NGUYEN, Quyen (2020): Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process. Published in: Journal of Asian Finance, Economics and Business , Vol. 07, No. 08 (3 July 2020): pp. 197-204.
Preview |
PDF
MPRA_paper_103437.pdf Download (260kB) | Preview |
Abstract
Nowadays, many construction engineering and technology enterprises are evolving to find that prosperity is driven and inspired by an open economy with dynamic markets and fierce multifaceted competition. Besides brand and product uniqueness, the ability to quickly provide customers with quotes are matters of concern. Such a requirement for prompt cost estimation of construction investment projects with the use of a construction price index poses a significant challenge to contractors. This is because the nature of the construction industry is shaped by changes in domestic and foreign economic factors, socio-financial issues, and is under the influence of various micro and macro factors. This paper presents a fuzzy decision-making approach for calculating critical factors that affect the construction price index. A qualitative approach was implemented based on in-depth interviews of experts in the construction industry in Vietnam. A synthetic comparison matrix was calculated using Buckley approach. The CoA approach was applied to defuzzified the fuzzy weights of factors that affect the construction price index. The research results show that the top five critical factors affecting the construction price index in Vietnam are (1) consumer price index, (2) gross domestic product, (3) basic interest rate, (4) foreign exchange rate, and (5) total export and import.
Item Type: | MPRA Paper |
---|---|
Original Title: | Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process |
English Title: | Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process |
Language: | English |
Keywords: | Analytical Hierarchy Process, Construction Enterprises, Construction Price Index, Multiple Decision Making, Fuzzy Logic |
Subjects: | D - Microeconomics > D2 - Production and Organizations > D24 - Production ; Cost ; Capital ; Capital, Total Factor, and Multifactor Productivity ; Capacity M - Business Administration and Business Economics ; Marketing ; Accounting ; Personnel Economics > M1 - Business Administration > M19 - Other O - Economic Development, Innovation, Technological Change, and Growth > O1 - Economic Development > O14 - Industrialization ; Manufacturing and Service Industries ; Choice of Technology P - Economic Systems > P2 - Socialist Systems and Transitional Economies > P22 - Prices |
Item ID: | 103437 |
Depositing User: | Dr. Phong Thanh Nguyen |
Date Deposited: | 16 Oct 2020 07:26 |
Last Modified: | 16 Oct 2020 07:26 |
References: | Akintoye, A., Bowen, P., & Hardcastle, C. (1998). Macro-economic leading indicators of construction contract prices. Construction Management & Economics, 16(2), 159-175. https://doi.org/10.1080/014461998372466 Boskin, M. J., Dulberger, E. L., Gordon, R. J., Griliches, Z., & Jorgenson, D. W. (1998). Consumer prices, the consumer price index, and the cost of living. Journal of Economic Perspectives, 12(1), 3-26. https://doi.org/10.1257/jep.12.1.3 Cao, Y., & Ashuri, B. (2020). Predicting the volatility of highway construction cost index using long short-term memory. Journal of Management in Engineering, 36(4). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000784 da Silva, G. J. C., & Pirtouscheg, L. A. S. (2015). Basic interest rate, bank competition and bank spread in personal credit operations in brazil: A theoretical and empirical analysis. EconomiA, 16(1), 32-45. https://doi.org/10.1016/j.econ.2014.12.001 Devaraj, S., Patel, P. C., & Hicks, M. J. (2020). Must access laws for opioid prescription and county gross domestic product: Evidence from the us. Applied Economics Letters. https://doi.org/10.1080/13504851.2020.1740155 El-Adaway, I. H., Ali, G. G., Abotaleb, I. S., & Barber, H. M. (2020). Studying the relationship between stock prices of publicly traded us construction companies and gross domestic product: Preliminary step toward construction-economy nexus. Journal of Construction Engineering and Management, 146(1). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001742 Elfahham, Y. (2019). Estimation and prediction of construction cost index using neural networks, time series, and regression. Alexandria Engineering Journal. doi:https://doi.org/10.1016/j.aej.2019.05.002 Gouvêa, R. R., & Schettini, B. P. (2015). Empirical estimates for the brazilian total imports equation using quarterly national accounts data (1996–2010). EconomiA, 16(2), 250-271. https://doi.org/10.1016/j.econ.2015.06.001 Ha, N. M., Le, N. D., & Trung-Kien, P. (2019). The impact of urbanization on income inequality: A study in vietnam. Journal of Risk and Financial Management, 12(3), 14. https://doi.org/10.3390/jrfm12030146 Konny, C. (2020). Modernizing data collection for the consumer price index. Business Economics, 55(1), 45-52. https://doi.org/10.1057/s11369-019-00146-3 Lalwani, V., & Chakraborty, M. (2020). Aggregate earnings and gross domestic product: International evidence. Applied Economics, 52(1), 68-84. https://doi.org/10.1080/00036846.2019.1640859 Lee, J. W., & Xuan, Y. (2019). Effects of technology and innovation management and total factor productivity on the economic growth of china. Journal of Asian Finance, Economics and Business, 6(2), 63-73. https://doi.org/10.13106/jafeb.2019.vol6.no2.63 Ling, F. Y. Y., & Hoang, V. T. P. (2010). Political, economic, and legal risks faced in international projects: Case study of vietnam. Journal of Professional Issues in Engineering Education and Practice, 136(3), 156-164. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000015 Long, L. D., Tran, D. H., & Nguyen, P. T. (2019). Hybrid multiple objective evolutionary algorithms for optimising multi-mode time, cost and risk trade-off problem. International Journal of Computer Applications in Technology, 60(3), 203-214. https://doi.org/10.1504/IJCAT.2019.100299 Luong, D. L., Tran, D. H., & Nguyen, P. T. (2018). Optimizing multi-mode time-cost-quality trade-off of construction project using opposition multiple objective difference evolution. International Journal of Construction Management, 01-13. https://doi.org/10.1080/15623599.2018.1526630 Mohamed Mustafa, A. M. (2019). Contribution of tourism and foreign direct investment to gross domestic product: Econometric analysis in the case of sri lanka. Journal of Asian Finance, Economics and Business, 6(4), 109-114. https://doi.org/10.13106/jafeb.2019.vol6.no4.109 Moon, S., Chi, S., & Kim, D. Y. (2018). Predicting construction cost index using the autoregressive fractionally integrated moving average model. Journal of Management in Engineering, 34(2), 04017063. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000571 Nguyen, H. M., Mai, L. T., & Huynh, T. L. (2019). The role of transformational leadership toward work performance through intrinsic motivation: A study in the pharmaceutical field in vietnam. Journal of Asian Finance, Economics and Business, 6(4), 201-212. https://doi.org/10.13106/jafeb.2019.vol6.no4.201 Nguyen, H. M., & Ngoc, B. H. (2020). Energy consumption - economic growth nexus in vietnam: An ardl approach with a structural break. Journal of Asian Finance, Economics and Business, 7(1), 101-110. https://doi.org/10.13106/jafeb.2020.vol7.no1.101 Nguyen, H. M., Nguyen, C., Ngo, T. T., & Nguyen, L. V. (2019). The effects of job crafting on work engagement and work performance: A study of vietnamese commercial banks. Journal of Asian Finance, Economics and Business, 6(2), 189-201. https://doi.org/10.13106/jafeb.2019.vol6.no2.189 Nguyen, K. Q. (2008). Impacts of a rise in electricity tariff on prices of other products in vietnam. Energy Policy, 36(8), 3145-3149. https://doi.org/10.1016/j.enpol.2008.04.013 Nguyen, M. H., Tran, B. T., & Huynh, L. T. (2019). Relation between employees and customers affects to the positive word of mouth through customer satisfaction. Journal of Distribution Science, 17(6), 65-75. https://doi.org/10.15722/JDS.17.6.201906.65 Nguyen, P., & Nguyen, P. (2020). Risk management in engineering and construction: A case study in design-build projects in vietnam. Engineering, Technology & Applied Science Research, 10(1), 5237-5241. Nguyen, P. T., & Likhitruangsilp, V. (2017). Identification risk factors affecting concession period length for public-private partnership infrastructure projects. International Journal of Civil Engineering and Technology, 8(6), 342-348. Nguyen, P. V., Nguyen, P. T., Nguyen, Q. L. H. T. T., & Huynh, V. D. B. (2019). Extended fuzzy analytical hierarchy process approach in determinants of employees' competencies in the fourth industrial revolution. International Journal of Advanced Computer Science and Applications, 10(4), 150-154. https://doi.org/10.14569/IJACSA.2019.0100417 Pham, H. C., Dao, N. N., Cho, S., Nguyen, P. T., & Pham-Hang, A. T. (2019). Construction hazard investigation leveraging object anatomization on an augmented photoreality platform. Applied Sciences (Switzerland), 9(21). https://doi.org/10.3390/app9214477 Qamruzzaman, M., Karim, S., & Wei, J. (2019). Does asymmetric relation exist between exchange rate and foreign direct investment in bangladesh? Evidence from nonlinear ardl analysis. Journal of Asian Finance, Economics and Business, 6(4), 115-128. https://doi.org/10.13106/jafeb.2019.vol6.no4.115 Rafiei, M. H., & Adeli, H. (2018). Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12), 04018106. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001570 Saar, C. C., Chuing, L. S., Yusof, A. M., Zakaria, R., & Chuan, T. M. (2019). Construction cost index: A case study in malaysia. Paper presented at the IOP Conference Series: Materials Science and Engineering. Shahandashti, S., & Ashuri, B. (2013). Forecasting engineering news-record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), 1237-1243. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000689 Sy, D. T., Likhitruangsilp, V., Onishi, M., & Nguyen, P. T. (2017). Different perceptions of concern factors for strategic investment of the private sector in public-private partnership transportation projects. ASEAN Engineering Journal, 7(2), 66-86. To, A. H., Ha, D. T. T., Nguyen, H. M., & Vo, D. H. (2019). The impact of foreign direct investment on environment degradation: Evidence from emerging markets in asia. International Journal of Environmental Research and Public Health, 16(9). https://doi.org/10.3390/ijerph16091636 Tu, M. T. C., & Giang, H. T. T. (2018). Estimating the impact of trade cost on export: A case study vietnam. Journal of Asian Finance, Economics and Business, 5(3), 43-50. https://doi.org/10.13106/jafeb.2018.vol5.no3.43 Vo, K. D., Nguyen, P. T., & Le-Hoai, L. (2019). The difference in personality traits of construction engineers in vietnam using the kts instrument. Suranaree Journal of Science and Technology, 26(2), 232-239. Wang, J., & Ashuri, B. (2017). Predicting enr construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), 47-63. https://doi.org/10.1080/15578771.2016.1235063 Wrana, J., & Nguyen, T. X. T. (2019). ‘Strategic coupling’ and regional development in a transition economy: What can we learn from vietnam? Area Development and Policy, 4(4), 455-466. https://doi.org/10.1080/23792949.2019.1608838 Zhang, R., Xing, J., Ye, K., Lu, W., & Shan, Y. (2019). Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(3), 367-385. https://doi.org/10.1108/ECAM-02-2018-0045 |
URI: | https://mpra.ub.uni-muenchen.de/id/eprint/103437 |