Nyoni, Thabani (2019): Cost overrun factors in construction industry: a case of Zimbabwe.
Preview |
PDF
MPRA_paper_96788.pdf Download (592kB) | Preview |
Abstract
Cost overruns (the amount of money by which actual costs exceed the initially approved costs) continue to characterize a plethora of construction projects, especially large projects. This is the reason why the hot debate in the construction industry on how to minimize cost overruns has been on for some time, especially among construction economists and engineers and yet the inability to complete construction projects within the budget remains a chronic problem worldwide. In Zimbabwe, it is now almost obvious that once a construction project has commenced; it will not be completed within the initial project budget. This study seeks to empirically determine cost overrun factors in the construction industry in Zimbabwe. From the analysis of the questionnaire, cost overrun factors were ranked using the Relative Importance Index (RII) technique. The overall results analysis indicate that poor estimation of original cost, lack of timeous reports during construction stage, corruption, construction productivity and contractual claims are amongst the top ten most important factors causing construction cost escalation. The study managed to come up with recommendations which are 7 – fold and are envisaged to help construction economists, managers and policy makers in initiating positive changes in the construction industry in Zimbabwe.
Item Type: | MPRA Paper |
---|---|
Original Title: | Cost overrun factors in construction industry: a case of Zimbabwe |
Language: | English |
Keywords: | Construction cost; Construction industry; Relative Importance Index (RII); Zimbabwe |
Subjects: | L - Industrial Organization > L7 - Industry Studies: Primary Products and Construction > L74 - Construction |
Item ID: | 96788 |
Depositing User: | MR. THABANI NYONI |
Date Deposited: | 03 Nov 2019 09:58 |
Last Modified: | 03 Nov 2019 09:58 |
References: | [1] Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice, Construction Management Economics, 18: 77 – 89. [2] Ali, A.S.& Kamaruzzaman, S.N. (2010). Cost Performance for Building Construction Projects in Klang Valley, Journal of Building Performance, 1 (1): 110 – 120. [3] Andric, J. M., Mahamadu, A. M., Wang, J., Zou, P. X. W., & Zhong, R. (2019). The Cost Performance and Causes of Overruns in Infrastructure Developments in Asia, Journal of Civil Engineering and Management, 25 (3): 203 – 214. https://doi.org/10.3846/jcem.2019.8646 [4] Azhar, N., Farooqui, R.& Ahmed, S. M. (2008). Cost overrun Factors in Construction Industry of Pakistan, 1st International Conference on Construction in Developing Countries, Karachi, Pakistan. [5] Bari, N.A.A., Yusuff, R., Ismail, N., Jaapar, A.,& Ahmad, N. (2012). Factors influencing the construction cost of Industrialized Building System (IBS) projects, Procedia – Social and Behavioural Sciences, 35: 689 – 696. [6] Bonga, W. G., Chiminya, J.,& Mudzingiri, C. (2015). An explanatory analysis of the economic and social impact of corruption in Zimbabwe, IOSR Journal of Economics and Finance (IOSR – JEF), 6 (1): 11 – 20. [7] Chan, S. L.,& Park, M. (2005). Project cost estimation using principal component regression, Construction Management Economics, 23: 295 – 304. [8] Creedy, G.D., Skitmore, M.,& Wong, J.K.W. (2010). Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects, Journal of Construction Engineering and Management, 136 (5): 528 – 537. [9] Creswell, R. (2014). Research design: qualitative, quantitative, and mixed methods approaches, USA: Sage Publications. [10] Durdyev, S., Omarov, M., Ismail, S., & Lim, M. (2017). Significant Contributors to Cost Overruns in Construction Projects in Cambodia, Cogent Engineering, 4 (2017): 1 – 10. https://doi.org/10.1080/23311916.2017.1383638 [11] Elhag, T.M.S., Boussabaine, A.H.,& Ballal, T.M.A. (2005). Critical determinants of construction tendering costs: Quantity Surveyor’s standpoint, International Journal of Project Management, 23: 538 – 545. [12] Elinwa, A. U.,& Buba, S. A. (1993). Construction cost factors in Nigeria, ASCE Journal of Construction Engineering and Management, 119: 698 – 713. [13] Enshassi, A., Al – Najjar, J.,& Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip, Journal of Financial Management of Property and Construction, 14 (2): 126 – 151. [14] Franca, A., & Haddad, A. (2018). Causes of Construction Projects Cost Overrun in Brazil, International Journal of Sustainable Construction Engineering and Technology, 9 (1): 69 – 83. https://doi.org/10.30880/ijscet.2018.09.01.006 [15] Frimpong, Y., Oluwoye, J.,& Crawford, L. (2003). Causes of delays and cost overruns in construction of ground water projects in developing countries: Ghana as a case study, International Journal of Project Management, 21: 321 – 326. [16] Ikechukwu, A. C.,& Akiohnbare, W. (2017). Factors affecting cost of construction in Nigeria, International Journal of Advancement In Engineering Technology, Management and Applied Science (IJAETMAS), 4 (6): 48 – 61. [17] Johnson, R. M., & Babu, R. I. I. (2018). Time and Cost Overruns in the UAE Construction Industry: A Critical Analysis, International Journal of Construction Management, 14 (2018): 1 – 11. https://doi.org/10.108015623599.2018.1484864 [18] Kirchberger, M. (2018). The Role of Construction Sector, WIDER, Working Paper No. 146. [19] Long, L.H., Lee, Y.D.,& Lee, J.Y. (2008). Delay and Cost Overruns in Vietnam Large Construction: A Comparison with Other Selected Countries, KSCE Journal of Civil Engineering, 12 (6): 367 – 377. [20] Makumbe, J. (1994). Bureaucratic corruption in Zimbabwe: causes and magnitude of the problem, Journal of African Development, 19 (3): 45 – 60. [21] Makumbe, J. (2009). The impact of democracy in Zimbabwe – Assessing political, economic and social developments since the dawn of democracy, Research Report, Centre for Policy Studies, Johannesburg. [22] Makumbe, J. (2011). Political corruption is driver of corruption in corruption: essays on the state of corruption in Zimbabwe under GNU, OSISA, 6 – 12. [23] Memon, A.H., Abdul, R.I., Abdullah, M.R.,& Abdu, A.A. (2010). Factors affecting construction cost in Mara Large Construction Project: Perspective of Project Management Consultant, International Journal of Sustainable Construction Engineering and Technology, 1 (2): 41 – 54. [24] Memon, A.H., Rahman, I.A., Abdullah, M.R & Azis, A.A.A. (2014). Factors affecting construction cost performance in project management projects: Case of MARA large projects, International Journal of Civil Engineering and Built Environment, 1 (1): 30 – 35. [25] Nega, F. F. (2008). Causes and Effects of Cost Overrun on Public Building Construction Projects in Ethiopia, Master Thesis, Civil Engineering Department – Addis Ababa University, Addis Ababa. [26] Nyoni, T. (2017). The Curse of Corruption In Zimbabwe, International Journal of Advanced Research and Publications (IJARP), 1 (5): 285 – 291. [27] Nyoni, T. (2018d). An Empirical Assessment of Causes & Effects of Delay in Residential Construction Projects in Harare, Zimbabwe, ARSEAM International Journal of Advances in Engineering & Scientific Research, 5 (1): 34 – 46. [28] Nyoni, T.,& Bonga, W. G. (2017a). Towards Factors Affecting Delays in Construction Projects: A Case of Zimbabwe, Dynamic Research Journals Journal of Economics and Finance (DRJ – JEF), 2 (1): 12 – 38. [29] Nyoni, T.,& Bonga, W. G. (2017f). An Empirical Analysis of the Determinants of Private Investment in Zimbabwe, Dynamic Research Journals Journal of Economics and Finance (DRJ – JEF), 2 (4): 38 – 54. [30] Nyoni, T.,& Bonga, W.G. (2016). An Empirical Investigation of Factors Affecting Construction Sector Labour Productivity in Zimbabwe, International Journal of Business and Management Invention (IJBMI), 5 (8): 68 – 79. [31] Olawale, Y.,& Sun, M. (2010). Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice, Construction Management and Economics, 28 (5): 509 – 526. [32] Omoregie, A.,& Radford, D. (2012). Infrastructure delay and cost escalations: causes and effects in Nigeria, De Montford University, England. [33] Oyedele, O.A. (2015). Evaluation of Factors Affecting Construction Cost Estimation Methods in Nigeria, FIG Working Paper Series, Sofia, Bulgaria. [34] Prasad, K., Vasugi, V., Venkatesan, R., & Bhat, N. S. (2019). Critical Causes of Time Overrun in Indian Construction Projects and Mitigation Measures, International Journal of Construction Education and Research, 15 (3): 216 – 238. https://doi.org/10.1080/15578771.2018.1499569 [35] Seddeeq, A. B., Assaf, S., Abdallatif, A., & Hassanain, A. M. (2019). Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry, Buildings, 9 (41): 1 – 19. https://doi.org/10.3390/buildings9020041 [36] Shabniya, V. (2017). Factors Affecting Construction Cost Estimation of Building Projects, International Journal of Recent Trends in Engineering & Research, 3 (4): 379 – 387. [37] Sithole, A. (2013). Corruption in Zimbabwean Urban Local Authorities: A case of Gweru city council, Asia Journal of Social Sciences and Humanities (AJSSH), 2 (3): 26 – 33. [38] Stoy, C.,& Schalcher, H.R. (2007). Residential building projects: building cost estimators and drivers, ASCE Construction Engineering and Management, 133: 139 – 145. [39] Stoy, C., Pollaris, S & Schalcher, H. R (2008). Drivers for cost estimating in early design: case study of residential construction, ASCE Construction Engineering and Management, 134: 32 – 39. [40] Subramani, T., Sruthi, P.S & Kavitha, M. (2014). Causes and cost of overrun in construction, IOSR Journal of Engineering (IOSRJEN), 4 (6): 01 – 07. [41] Tavakol, M., & Dennick, R. (2011). Making sense of cronbach’s alpha. International Journal of Medical Education, 53-55. [42] Toh, T., Ting, C., Ali, K.,& Aliagha, G. (2012). Critical cost factors of building construction projects in Malaysia, Procedia – Social and Behavioural Sciences, 57: 360 – 367. [43] Tyler, E. J. (2004). National Electrical Estimator, Craftsman Book Company, California. [44] Xiao, H.,& Proverbs, D. (2002). The performance of contractors in Japan, the UK and USA: A comparative evaluation of construction cost, Construction Management and Economics, 22: 425 – 435. |
URI: | https://mpra.ub.uni-muenchen.de/id/eprint/96788 |