¿Cuánto tardan los permisos de edificación habitacional en iniciar obras?: Caso Chile

Idrovo Aguirre, Byron and Lozano Navarro, Francisco-Javier (2018): ¿Cuánto tardan los permisos de edificación habitacional en iniciar obras?: Caso Chile. Published in: Documentos de Trabajo CChC No. 86 (1 March 2018)

[thumbnail of MPRA_paper_118263.pdf]
Preview
PDF
MPRA_paper_118263.pdf

Download (401kB) | Preview

Abstract

This research paper constitutes a first effort to establish a timing metric for the start of construction of housing building permits in Chile, by means of a neoclassical equation of stock accumulation, estimated through a state-space model with Kalman filter. Among the main findings, most urbanized and populated regions exhibit a time lapse between 6 and 10 months, similar to that found at the national level. This means that, on average, the period from permit approval until works start, oscillates around 7.3 months for regions concentrating almost all residential real estate development in the country, while most regions fluctuate around 12 months.

Atom RSS 1.0 RSS 2.0

Contact us: mpra@ub.uni-muenchen.de

This repository has been built using EPrints software.

MPRA is a RePEc service hosted by Logo of the University Library LMU Munich.