Eliasson, Jonas (2025): Cost overruns of infrastructure projects – distributions, causes and remedies. Forthcoming in: Transportation Research Part A
This is the latest version of this item.
![]() |
PDF
MPRA_paper_124708.pdf Download (8MB) |
Abstract
This paper analyses the accuracy of cost estimates for Swedish transport infrastructure projects 2004-2022, discusses causes of cost overruns, and suggests remedies. Cost estimates for all projects in the national investment plans 2010-2022 are tracked from early planning to completion. Final costs for all projects finished 2004-2022 are compared to decision-to-build cost estimates. Results show considerable cost escalation during the planning stages, on average, while cost estimates at the decision-to-build are close to final costs, on average. Cost escalations during the planning stage are not uniform, however: the distribution of cost changes is highly skewed with a long right tail. The reason that final costs tend to exceed early cost estimates is that project decisions are effectively locked in before projects’ costs and benefits have been thoroughly assessed. Lock-in of premature decisions does not only cause cost overruns; even worse, it distorts project selection and design, reduces incentives to search for more cost-efficient designs, and increases opportunities and incentives for project beneficiaries to underestimate costs and overestimate benefits. Several ways to tackle these problems are suggested.
Item Type: | MPRA Paper |
---|---|
Original Title: | Cost overruns of infrastructure projects – distributions, causes and remedies |
Language: | English |
Keywords: | cost overruns; transport infrastructure; project management; decision processes; transport policy |
Subjects: | H - Public Economics > H5 - National Government Expenditures and Related Policies > H54 - Infrastructures ; Other Public Investment and Capital Stock R - Urban, Rural, Regional, Real Estate, and Transportation Economics > R4 - Transportation Economics > R42 - Government and Private Investment Analysis ; Road Maintenance ; Transportation Planning R - Urban, Rural, Regional, Real Estate, and Transportation Economics > R4 - Transportation Economics > R48 - Government Pricing and Policy |
Item ID: | 124708 |
Depositing User: | Professor Jonas Eliasson |
Date Deposited: | 09 May 2025 13:21 |
Last Modified: | 09 May 2025 13:21 |
References: | Ahiaga-Dagbui, D. D., Love, P. E. D., Smith, S. D., & Ackerman, F. (2017). Toward a Systemic View to Cost Overrun Causation in Infrastructure Projects: A Review and Implications for Research. Project Management Journal, 48(2). https://journals-sagepub-com.e.bibl.liu.se/doi/10.1177/875697281704800207 Aubry, M., Floricel, S., Gilchrist, A., Kirkham, R. J., Samset, K., Wee, B. V., Volden, G. H., Williams, T., & Zwikael, O. (2025). Paradoxes and trade-offs in the front-end process of large public projects. Production Planning & Control, 1–18. https://doi.org/10.1080/09537287.2025.2456959 Berg, H., Strand Alfredsen Larsen, A., Klakegg, O. J., & Welde, M. (2025). Cost estimation in major public projects’ front-end phase: An empirical study on how to improve current practices. Project Leadership and Society, 6, 100171. https://doi.org/10.1016/j.plas.2024.100171 Brown, A. L., Imai, T., Vieider, F. M., & Camerer, C. F. (2024). Meta-analysis of Empirical Estimates of Loss Aversion. Journal of Economic Literature, 62(2), 485–516. https://doi.org/10.1257/jel.20221698 Cantarelli, C. C., Flyvbjerg, B., van Wee, B., & Molin, E. J. E. (2010). Lock-in and its Influence on the Project Performance of Large-Scale Transportation Infrastructure Projects: Investigating the Way in Which Lock-in Can Emerge and Affect Cost Overruns. Environment and Planning B: Planning and Design, 37(5), 792–807. https://doi.org/10.1068/b36017 Catalão, F. P., Cruz, C. O., & Sarmento, J. M. (2019). The determinants of cost deviations and overruns in transport projects, an endogenous models approach. Transport Policy, 74, 224–238. https://doi.org/10.1016/j.tranpol.2018.12.008 Catalão, F. P., Cruz, C. O., & Sarmento, J. M. (2021). Determinants of cost deviations and overruns in UK transport projects. Proceedings of the Institution of Civil Engineers - Transport, 1–11. https://doi.org/10.1680/jtran.20.00067 Cavalieri, M., Cristaudo, R., & Guccio, C. (2019a). On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects. Transport Policy, 79, 21–36. https://doi.org/10.1016/j.tranpol.2019.04.001 Cavalieri, M., Cristaudo, R., & Guccio, C. (2019b). Tales on the dark side of the transport infrastructure provision: A systematic literature review of the determinants of cost overruns. Transport Reviews, 39(6), 774–794. https://doi.org/10.1080/01441647.2019.1636895 Chapman, P. (2024a). Project delivery performance: Insights from English roads major schemes. Project Leadership and Society, 5, 100128. https://doi.org/10.1016/j.plas.2024.100128 Chapman, P. (2024b). Revisiting Project Delivery Performance: Evidence from Swedish Transport Infrastructure. Project Management Journal, 87569728241257391. https://doi.org/10.1177/87569728241257391 Chapman, P., & Quang, C. (2021). Major project risk management: Reconciling complexity during delivery with the inside view in planning. Engineering Project Organization Journal, 10(1), 28–28. Chong, U., & Hopkins, O. (2016). An international experience on the evolution of road costs during the project life cycle. Transport Policy, 48, 60–66. https://doi.org/10.1016/j.tranpol.2016.02.010 Cooke-Davies, T. J. (2004). Consistently doing the right projects and doing them right–What metrics do you need. The Measured, 4(2), 44–52. Eliasson, J. (2015). Problemstyrd planering: En förklaring till att effektivitet spelar så liten roll för valet av transportåtgärder. In M. Welde (Ed.), Transportplanering och samhällsekonomi i Skandinavien. Concept. https://swopec.hhs.se/ctswps/abs/ctswps2015_015.htm Eliasson, J. (2023). Tillbaka till framtiden: En nygammal infrastrukturplanering. In J. Nyström (Ed.), Vägval – fem tankar om framtidens planeringsmodell för Sveriges infrastruktur. Svenskt Näringsliv. Eliasson, J., & Fosgerau, M. (2013). Cost overruns and benefit shortfalls—Deception or selection? Transportation Research B, 57, 105–113. https://doi.org/10.1016/j.trb.2013.09.005 Flyvbjerg, B. (2009). Survival of the unfittest: Why the worst infrastructure gets built—and what we can do about it. Oxford Review of Economic Policy, 25(3), 344–367. https://doi.org/10.1093/oxrep/grp024 Flyvbjerg, B. (2014). What you Should Know about Megaprojects and Why: An Overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409 Flyvbjerg, B. (2021). Top Ten Behavioral Biases in Project Management: An Overview. Project Management Journal, 52(6), 531–546. https://doi.org/10.1177/87569728211049046 Flyvbjerg, B., Ansar, A., Budzier, A., Buhl, S., Cantarelli, C., Garbuio, M., Glenting, C., Holm, M. S., Lovallo, D., Lunn, D., Molin, E., Rønnest, A., Stewart, A., & van Wee, B. (2018). Five things you should know about cost overrun. Transportation Research Part A: Policy and Practice, 118, 174–190. https://doi.org/10.1016/j.tra.2018.07.013 Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating Costs in Public Works Projects: Error or Lie? Journal of the American Planning Association, 68(3), 279–295. https://doi.org/10.1080/01944360208976273 Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2004). What Causes Cost Overrun in Transport Infrastructure Projects? Transport Reviews, 24(1), 3–18. https://doi.org/10.1080/0144164032000080494a Gao, N., & Touran, A. (2020). Cost Overruns and Formal Risk Assessment Program in US Rail Transit Projects. Journal of Construction Engineering and Management, 146(5), 05020004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001827 Jäderholm, B. (2020). Stora transportinfrastrukturprojekt—Varför blir de försenade och dyrare än vad man räknat med. Beskrivning och analys av sju stora projekt [Manuscript]. Lind, H., & Brunes, F. (2014). Policies to avoid cost overruns in infrastructure projects: Critical evaluation and recommendations. The Australasian Journal of Construction Economics and Building, 14(3), 74–85. https://doi.org/10.3316/informit.602898234636185 Lind, H., & Brunes, F. (2015). Explaining cost overruns in infrastructure projects: A new framework with applications to Sweden. Construction Management and Economics, 33(7), 554–568. https://doi.org/10.1080/01446193.2015.1064983 Love, P. E. D., & Ahiaga-Dagbui, D. D. (2018). Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects. Transportation Research Part A: Policy and Practice, 113, 357–368. https://doi.org/10.1016/j.tra.2018.04.019 Love, P. E. D., Pinto, J. K., & Ika, L. A. (2022). Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future. IEEE Engineering Management Review, 35. Lundberg, M., Jenpanitsub, A., & Pyddoke, R. (2011). Cost overruns in Swedish transport projects (CTS Working Paper 2011:11). Centre for Transport Studies, KTH Royal Institute of Technology. http://www.diva-portal.org/smash/get/diva2:669340/FULLTEXT01.pdf Makovšek, D. (2014). Systematic construction risk, cost estimation mechanism and unit price movements. Transport Policy, 35, 135–145. https://doi.org/10.1016/j.tranpol.2014.04.012 McLeod, S. (2023). Rethinking public infrastructure megaproject performance: Theorizing alternative benefits, and the need for open science in project research. Project Leadership and Society, 4, 100080. https://doi.org/10.1016/j.plas.2023.100080 Merrow, E. W., McDonnell, L. M., & Arguden, R. Y. (1988). Understanding the Outcomes of Mega-Projects: A Quantitative Analysis of Very Large Civilian Projects. RAND Corporation. https://www.rand.org/pubs/reports/R3560.html National Audit Office. (2007). Estimating and monitoring the costs of building roads in England (HC 321 Session 2006-2007; Report by the Comptroller and Auditor General). https://www.nao.org.uk/wp-content/uploads/2007/03/0607321.pdf Nilsson, J.-E. (2013). Systemic errors in the transport sector (2013:3; Finanspolitiska Rådet). https://www.fpr.se/download/18.28ce3f32184f580967d67d/1670593943569/2013-3%20The%20Swedish%20Road%20and%20Transport%20Research%20Institute%20(VTI)%20-%20Systemic%20errors%20in%20the%20transport%20sector.pdf.pdf Nilsson, J.-E. (2022). The Weak Spot of Infrastructure BCA: Cost Overruns in Seven Road and Railway Construction Projects. Journal of Benefit-Cost Analysis, 13(2), 224–246. https://doi.org/10.1017/bca.2022.10 Nilsson, J.-E., Nyström, J., & Salomonsson, J. (2019). Kostnadsöverskridande i Trafikverkets entreprenadkontrakt (VTI Rapport 1011; VTI Rapport). Swedish Road and Transport Research Institute. https://www.diva-portal.org/smash/record.jsf?pid=diva2:1701266 Odeck, J. (2004). Cost overruns in road construction—What are their sizes and determinants? Transport Policy, 11(1), 43–53. https://doi.org/10.1016/S0967-070X(03)00017-9 Odeck, J. (2014). Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway. Transportation Research Part A: Policy and Practice, 65, 68–79. https://doi.org/10.1016/j.tra.2014.04.005 Odeck, J. (2019). Variation in cost overruns of transportation projects: An econometric meta-regression analysis of studies reported in the literature. Transportation, 46(4), 1345–1368. https://doi.org/10.1007/s11116-017-9836-5 Odeck, J., & Welde, M. (2021). Cost Overruns of Transportation Infrastructure Projects. In R. Vickerman (Ed.), International Encyclopedia of Transportation (pp. 483–489). Elsevier. https://doi.org/10.1016/B978-0-08-102671-7.10089-2 Odeck, J., Welde, M., & Volden, G. H. (2015). The Impact of External Quality Assurance of Costs Estimates on Cost Overruns: Empirical Evidence from the Norwegian Road Sector. European Journal of Transport and Infrastructure Research, 15(3), 1–7. Park, J. E. (2021). Curbing cost overruns in infrastructure investment: Has reference class forecasting delivered its promised success? European Journal of Transport and Infrastructure Research, 21(2), Article 2. https://doi.org/10.18757/ejtir.2021.21.2.5504 Riksrevisionen. (2010). Kostnadskontroll i stora väginvesteringar? (RiR 2010:25). Swedish Audit Office. https://www.riksrevisionen.se/rapporter/granskningsrapporter/2010/kostnadskontroll-i-stora-vaginvesteringar.html Riksrevisionen. (2011). Kostnadskontroll i stora järnvägsinvesteringar? (2011:6; RiR). Swedish Audit Office. https://www.riksrevisionen.se/rapporter/granskningsrapporter/2011/kostnadskontroll-i-stora-jarnvagsinvesteringar.html Riksrevisionen. (2021). Kostnadskontroll i infrastrukturinvesteringar (text 2021:22; Granskningsrapport). Riksrevisionen. https://www.riksrevisionen.se/rapporter/granskningsrapporter/2021/kostnadskontroll-i-infrastrukturinvesteringar.html Riksrevisionen. (2023). Nationell plan för transportinfrastrukturen – lovar mer än den kan hålla (RiR 2023:25). Swedish Audit Office. https://www.riksrevisionen.se/rapporter/granskningsrapporter/2023/nationell-plan-for-transportinfrastrukturen---lovar-mer-an-den-kan-halla.html Samset, K., & Volden, G. H. (2016). Front-end definition of projects: Ten paradoxes and some reflections regarding project management and project governance. International Journal of Project Management, 34(2), 297–313. https://doi.org/10.1016/j.ijproman.2015.01.014 Trafikverket. (2018). Analys av förändringar i beräknade kostnader för investeringsobjekt (2018:095). Trafikverket. https://trafikverket.ineko.se/analys-av-f%C3%B6r%C3%A4ndringar-i-ber%C3%A4knade-kostnader-f%C3%B6r-investeringsobjekt Trafikverket. (2021a). Förslag till nationell plan för transportinfrastrukturen 2022 – 2033 (2021:186; Trafikverket Rapport). http://trafikverket.diva-portal.org/smash/get/diva2:1615267/FULLTEXT01.pdf Trafikverket. (2021b). Kostnadsutveckling vid upphandling och genomförande av investeringsprojekt (2021:090). Trafikverket. http://trafikverket.diva-portal.org/smash/get/diva2:1540112/FULLTEXT01.pdf Trafikverket. (2024). Inriktningsunderlag inför infrastrukturplaneringen för perioden 2026−2037 (Trafikverket 2024:003). https://trafikverket.diva-portal.org/smash/get/diva2:1827847/FULLTEXT01.pdf UK Department for Transport. (2021). Updating the evidence behind the optimism bias uplifts for transport appraisals. https://www.gov.uk/government/publications/tag-updated-evidence-for-optimism-bias-uplifts UK Department for Transport. (2024). TAG unit A1.2 scheme costs. https://www.gov.uk/government/publications/webtag-tag-unit-a1-2-scheme-costs-july-2017 Volden, G. H., Welde, M., Engebø, A., & Andersen, B. S. (2024). Do nothing, do minimum or do something? Why public project appraisals “always” recommend large projects. International Journal of Managing Projects in Business, 17(3), 430–454. https://doi.org/10.1108/IJMPB-11-2023-0251 Welde, M., & Dahl, R. E. (2021). Cost Escalation in Road Construction Contracts. Transportation Research Record, 2675(9), 1006–1015. https://doi.org/10.1177/03611981211005462 Welde, M., & Klakegg, O. J. (2022). Avoiding cost overrun through stochastic cost estimation and external quality assurance. IEEE Transactions on Engineering Management, 71, 1984–1997. Welde, M., & Odeck, J. (2017). Cost escalations in the front-end of projects – empirical evidence from Norwegian road projects. Transport Reviews, 37(5), 612–630. https://doi.org/10.1080/01441647.2016.1278285 Williams, T., & Samset, K. (2010). Issues in front-end decision making on projects. Project Management Journal, 41(2), 38–49. https://doi.org/10.1002/pmj.20160 Williams, T., Vo, H., Samset, K., & Edkins, A. (2019). The front-end of projects: A systematic literature review and structuring. Production Planning & Control, 30(14), 1137–1169. https://doi.org/10.1080/09537287.2019.1594429 |
URI: | https://mpra.ub.uni-muenchen.de/id/eprint/124708 |
Available Versions of this Item
-
Cost overruns of infrastructure projects – distributions, causes and remedies. (deposited 04 Dec 2024 07:32)
- Cost overruns of infrastructure projects – distributions, causes and remedies. (deposited 09 May 2025 13:21) [Currently Displayed]