Chandan, Sharma and Bhanumurthy, N R (2010): Estimating Infrastructural Investment Needs for India.
Preview |
PDF
MPRA_paper_22188.pdf Download (439kB) | Preview |
Abstract
This paper attempts to systemically project the demand and fund requirements of the Indian infrastructure sector up to 2013. In the infrastructure sector transportation (rail, port, air and road), electricity and telecommunication sectors are covered in this study. Our analysis is performed in three stages. In the first stage, long run linkage between infrastructure variables and income are established by applying cointegration method. Subsequently, infrastructure demand functions are estimated by using Dynamic OLS (DOLS) technique. In the second stage, by using the estimated infrastructure elasticity to income of variables and IMF’s projected income data, we project the sector-wise demand and funding requirement. In the final stage, we put forward some suggestions for reforms in infrastructure financing, so the projected demand in the country would be achieved. The results of the analysis indicates that in important sectors like electricity and port, the government(the Planning Commission) has seriously underestimated the future demand, while in air transport sector, the demand seems to be overestimated. Only in telecommunication sector, the projections of this study are at par with their projections. Overall, we find that the government has at least 7% underestimated the infrastructure needs. Based on these results, we propose for initiation of a set of reforms in existing financing pattern of infrastructure in the country
Item Type: | MPRA Paper |
---|---|
Original Title: | Estimating Infrastructural Investment Needs for India |
Language: | English |
Keywords: | Infrastructure projection, DOLS, India |
Subjects: | H - Public Economics > H5 - National Government Expenditures and Related Policies > H54 - Infrastructures ; Other Public Investment and Capital Stock C - Mathematical and Quantitative Methods > C5 - Econometric Modeling > C53 - Forecasting and Prediction Methods ; Simulation Methods |
Item ID: | 22188 |
Depositing User: | Bhanumurthy NR |
Date Deposited: | 19 Apr 2010 18:08 |
Last Modified: | 28 Sep 2019 17:20 |
References: | Al-azzam, A.; Hawdon, D. (1999). “Estimating the Demand for Energy in Jordan: A Stock- Watson dynamic OLS (DOLS) Approach”. SEEDS Economics Discussion Papers no. 97, Surrey Energy Economics Centre, Guildford. Akmal, M. and Stern, D. I. (2001). “Residential Energy Demand in Australia: An Application of Dynamic OLS”. Working Papers in Ecological Economics, 0104: 1-26, Centre for Resource and Environmental Studies, Australian National University. Aschauer, D.A. (1989). “Is Public Expenditure Productive”. Journal of Monetary Economics, Vol. 23, pp.177– 200. Fay, Marianne (2001). “Financing the Future: Infrastructure Needs in Latin America, 2000-05”. World Bank Policy Research Working Paper Series 2545, The World Bank. Fay, Marianne and Yepes, Tito (2003). “Investing in infrastructure : what is needed from 2000 to 2010?”. Policy Research Working Paper Series 3102, The World Bank. Fedderke, J.W. and Bogetic, Z. (2006). “Infrastructure and Growth in South Africa: Direct and Indirect Productivity Impacts of 19 Infrastructure Measures”. Policy Research Working Paper Series 3989, The World Bank, Washington D.C. Ghosh, Buddhadeb and Prabir De. (2004). “How Do Different Categories of Infrastructure Affect Development? Evidence from Indian States”. Economic and Political Weekly, Vol. 33, no. 47-48. Government of India(2010): ‘Investment in Infrastructure during the Eleventh Five Year Plan’ by the Secretariat of Infrastructure, Planning Commission of India. Hulten, C. R., Bennathan, E. and Srinivasan, S. (2006). “Infrastructure, Externalities, and Economic Development: A Study of the Indian Manufacturing Industry.” The World Bank Economic Review, Vol. 20, no. 2, pp. 291-308. Hulten, C. R. and Schwab, R. M. (1997). “A Fiscal Federalism Approach to Infrastructure Policy”. Regional Science and Urban Economics, Vol. 27, issue2, pp.139-159. Irffi, Guilherme,Ivan Castelar, Siqueira Marcelo and Linhares Fabrício (2008) “Dynamic OLS and Regime Switching Models to Forecast the Demand for Electricity in the Northeast of Brazil”. (Downloaded fromhttp://epge.fgv.br/finrio/myreview/FILES/CR2/p44.pdf). Johansen, S., (1988). “Statistical Analysis of Cointegration Vectors”. Journal of Economic Dynamics and Control, Vol.12 pp. 231-254. Johansen, S. and Juselius, K. (1990). "Maximum Likelihood Estimation and Inference on Cointegration--With Applications to the Demand for Money," Oxford Bulletin of Economics and Statistics, Department of Economics, University of Oxford, Vol. 52(2), pp. 169-210. Masih, R. and Masih, A. M. M.(1996) “Stock-Watson Dynamic OLS (DOLS) and Error Correction Modeling Approaches to Estimating Long and Short Run Elasticities in a Demand Function: New Evidence and Methodological Implications from an Application to the Demand for Coal in Mainland China” Energy Economics, Vol. 20, pp. 315-334. Mitra, A., Varoudakis A. and Véganzonès-Varoudakis, Marie-Ange (2002) “Productivity and Technical Efficiency in Indian States' Manufacturing: The Role of Infrastructure”. Economic Development and Cultural Change, Vol. 50, pp.395–426. Report of the Working Group on Civil Aviation for the Eleventh Five Year Plan (2007-2012) (Downloaded from http://www.planningcommission.nic.in/plans/planrel/11thf.htm) Report of the Working Group on Ports for the Eleventh Five Year Plan (2007-2012) (Downloaded from http://www.planningcommission.nic.in/plans/planrel/11thf.htm) Report of the Working Group on the Power for the Eleventh Five Year Plan (2007-2012) (Downloaded from http://www.planningcommission.nic.in/plans/planrel/11thf.htm) Report of the Working Group on Railways for the Eleventh Five Year Plan (2007-2012) (Downloaded from http://www.planningcommission.nic.in/plans/planrel/11thf.htm) Report of the Working Group on Road Transport for the Eleventh Five Year Plan (2007-2012) (Downloaded from http://www.planningcommission.nic.in/plans/planrel/11thf.htm) Report of the Working Group on Telecom sector for the Eleventh Five Year Plan (2007-2012) (Downloaded from http://www.planningcommission.nic.in/plans/planrel/11thf.htm) Saikkonen, P., (1991). “Asymptotically Efficient Estimation of Cointegrating Regressions”, Econometrics Theory, 7 1-21. Stock, J.H. and Watson, M. (1993). “A Simple Estimator of Cointegrating Vectors in Higher Order Integrated Systems”. Econometrica, Vol. 61, pp. 783-820. Zegeye, Aklilu A. (2000). “U.S. Public Infrastructure and its contribution to private sector productivity”. Working Paper 329, U.S. Department of Labor, Bureau of Labor Statistics, June. |
URI: | https://mpra.ub.uni-muenchen.de/id/eprint/22188 |