METODA SZACOWANIA KOSZTÓW INWESTYCYJNYCH ORAZ EKSPLOATACYJNYCH PRZENOŚNIKÓW

Jurdziak, Leszek (2008): METODA SZACOWANIA KOSZTÓW INWESTYCYJNYCH ORAZ EKSPLOATACYJNYCH PRZENOŚNIKÓW. Published in: Mining Science , Vol. X, No. 1 (2008): pp. 76-88.

[thumbnail of METODA SZACOWANIA.pdf]
Preview
PDF
METODA SZACOWANIA.pdf

Download (862kB) | Preview

Abstract

The method of variant capital and operational cost estimation of belt conveyors based on LCA (Life Cycle Analysis) with usage of Monte Carlo simulation of belt and idlers replacements for given distributions of their operational time is described. It is proposed to evaluate different variants of conveyors through comparison of sums of discounted costs for generated in Crystal Ball v.7.3 program stream of replacements of belts and idlers during the whole period of planned conveyor operation. Example calculation has been carried out for the hypothetical conveyor having the length 1000m. The method requires further development by addition of discounted costs of energy conveyor consumption and correlations among belt conveyor parameters and parameters of operational time distributions. Then it can be used by conveyor designers and users for comparison of different conveyor variants, optimisation of solutions, planning of conveyor maintenance expenses and optimisation of inventory policy.

Atom RSS 1.0 RSS 2.0

Contact us: mpra@ub.uni-muenchen.de

This repository has been built using EPrints software.

MPRA is a RePEc service hosted by Logo of the University Library LMU Munich.