Peeters, Marga (1998): Persistence, asymmetries and interrelation in factor demand. Published in: Scandinavian Journal of Economics , Vol. 4, No. 100 : pp. 747-764.
Preview |
PDF
MPRA_paper_23864.pdf Download (216kB) | Preview |
Abstract
A neoclassical factor demand model for structures, equipment and labour is analyzed. It incorporates a variety of dynamic specifications, such as a multi-period time-to-build for structures, internal adjustment costs for each production factor, and external investment adjustment costs. First-order conditions of the model are estimated by the generalized method of moments using manufacturing industry data from the US, Canada, West Germany, the UK (all 1960.I-1988.IV), France (1970.I-1992.II) and the Netherlands (1971.I-1990.IV). The results endorse time-to-build for structures, persistence of technology shocks and interrelations in adjustment cost dynamics.
Item Type: | MPRA Paper |
---|---|
Original Title: | Persistence, asymmetries and interrelation in factor demand |
Language: | English |
Keywords: | factor demand; time-to-build; adjustment costs; business cycles; general method of moments; structures; equipment; gestation; irreversibility; |
Subjects: | D - Microeconomics > D2 - Production and Organizations > D21 - Firm Behavior: Theory C - Mathematical and Quantitative Methods > C3 - Multiple or Simultaneous Equation Models ; Multiple Variables > C32 - Time-Series Models ; Dynamic Quantile Regressions ; Dynamic Treatment Effect Models ; Diffusion Processes ; State Space Models C - Mathematical and Quantitative Methods > C3 - Multiple or Simultaneous Equation Models ; Multiple Variables D - Microeconomics > D9 - Intertemporal Choice > D92 - Intertemporal Firm Choice, Investment, Capacity, and Financing J - Labor and Demographic Economics > J2 - Demand and Supply of Labor > J23 - Labor Demand |
Item ID: | 23864 |
Depositing User: | Marga (H.M.M.) Peeters |
Date Deposited: | 08 Feb 2011 09:28 |
Last Modified: | 02 Oct 2019 12:14 |
References: | Altug, 1989, Time-to-build and aggregate fluctuations: Some evidence, International Economic Review 30, 889-920. Bentolila and Bertola, 1990, Firing costs and labour demand: How bad is Eurosclerosis? Review of Economic Studies 57, 381-402. Bertola and Caballero, 1994, Irreversibility and aggregate investment, Review of Economic Studies 61, 223-246. Brechling, 1975, Investment and employment decisions, Manchester University Press. Burda, 1991, Monopolistic competition costs of adjustment and the behavior of European manufacturing employment, European Economic Review 35, 61-79. Dixit and Pindyck, 1994, Investment under uncertainty, Princeton University Press. Eisner and Strotz, 1963, Determinants of business investment, 60-337. Hansen, 1982, Large sample properties of generalized method of moments estimators, Econometrica 50, 1029-1054. Jorgenson, 1963, Capital theory and investment behavior, American Economic Review 53, 47-56. Kalecki, 1935, A macroeconomic theory of business cycles, Econometrica 3, 327-344. Kydland and Prescott, 1982, Time to build and aggregate fluctuations, Econometrica 50, 1345-1370. Mayer, 1996, Plant and equipment lead times, The Journal of Business 33, 327-344. Montgomery, 1995, Time to build completion patterns for non-residential structures, Economics Letters 48, 155-163. Mosconi and Giannini, 1992, Non-causality in cointegrated systems: representation estimation and testing, Oxford Bulletin of Economics and Statistics 54, 399-417. Palm, Peeters, and Pfann, 1993, Adjustment costs and time-to-build in factor demand in the US manufacturing industry, Empirical Economics 18, 639-671. Park, 1994, Gestation lags with variable plans: an empirical study of aggregate investment. Peeters H.M.M., 1996, Investment gestation lags: The difference between time-to-build and delivery lags, Applied Economics 28, 203-208. Peeters H.M.M., 1998, The dynamics of investment and labour demand: Theoretical issues and an application to the Dutch manufacturing indsutry, forthcoming in Economic Modelling. Pfann and Palm, 1993, Asymmetric adjustment costs in non-linear labour demand models for the Netherlands and the UK manufacturing sectors, Review of Economic Studies 60, 397-412. Sargent, 1978, Estimation of dynamic labor demand schedules under rational expectations, Journal of Political Economy 86, 1009-1044. Tauchen, 1986, Statistical properties of Generalized Method of Moments estimators of structural parameters obtained from financial market data, Journal of Business and Economic Studies 4, 397-416. |
URI: | https://mpra.ub.uni-muenchen.de/id/eprint/23864 |