Logo
Munich Personal RePEc Archive

Job design with conflicting tasks reconsidered

Schmitz, Patrick W. (2012): Job design with conflicting tasks reconsidered.

This is the latest version of this item.

[thumbnail of MPRA_paper_42394.pdf]
Preview
PDF
MPRA_paper_42394.pdf

Download (155kB) | Preview

Abstract

A principal wants two sequential tasks to be performed by wealth-constrained agents. Suppose that there is an outcome externality; i.e., a first-stage success can make second-stage effort more or less effective. If the tasks are conflicting, the principal's profit-maximizing way to induce high efforts is to hire one agent to perform both tasks (so that the prospect to get a larger second-stage rent after a first-stage success motivates the agent to work hard in the first stage). In contrast, when there is an effort externality (i.e., first-stage effort reduces or increases the probability of a second-stage success), then the principal prefers to hire two agents whenever the tasks are conflicting.

Available Versions of this Item

Atom RSS 1.0 RSS 2.0

Contact us: mpra@ub.uni-muenchen.de

This repository has been built using EPrints software.

MPRA is a RePEc service hosted by Logo of the University Library LMU Munich.